Definition. "Garden office" here means a structure suitable for full-time desk work in Irish weather: insulated, dry, electrically safe, with daylight and ventilation. Not a glorified shed with a desk and an extension lead.

Planning permission for a garden office

Same rules as a shed (25 m², 3 m / 4 m / 2.5 m heights. See planning permission). The change-of-use question:

  • Working from home as an employee: fine. Your domestic property is still domestic.
  • Running a business with no public-facing visits: fine. Same as above.
  • Running a business with clients visiting: change of use, needs planning permission.

Sleeping in the structure also triggers a change of use regardless of size. Bathroom plumbing brings Building Regulations into play.

The four spec tiers

TierMaterialsElectricsHeatingTotal budget
Basic Pressure-treated 8×6 timber, basic insulation Single power circuit, 4 sockets, lighting Plug-in panel heater €3,500-€5,500
Mid 10×8 timber, full Kingspan insulation, internal lining Sub-board, multiple circuits, 6 sockets Infrared panel or oil-filled rad €5,500-€8,500
Premium 10×10 timber or PVC-coated steel, double-glazed full window RECI-certified sub-board, RCBO, network Mini-split heat pump €8,500-€14,000
High-end SIPs construction, finished interior, full plumbing-ready Multi-circuit, fibre, smart-home wiring Heat pump + UFH €14,000+

Insulation: what actually works

Three layers do the heavy lifting:

  1. 100 mm Kingspan or Celotex between studs in walls and roof.
  2. 50 mm under-floor insulation, often overlooked. The floor is where most heat leaves a poorly insulated office.
  3. Continuous vapour-control layer (VCL) on the warm side of the insulation, taped at all joints.

Mineral wool is a budget alternative but performs noticeably worse in damp Irish conditions: moisture lowers its thermal performance. Spending €150 more on Kingspan/Celotex repays itself within two winters in lower heating bills.

The cold-bridge problem

Shed framing creates cold bridges where studs touch the cladding. Heat flows through the studs and bypasses the insulation. The mitigation: a continuous insulation layer (25-50 mm Kingspan) on the inside face of the studs before lining. Adds €200-€400 in materials and transforms winter performance, eliminating the cold "rib" lines that show up on a thermal camera in poorly insulated garden offices.

Electrics: DIY vs sparks

Anything connected to the main consumer unit must be RECI-certified work. The legal/insurance line is clear:

  • You can: dig the trench, lay conduit, pull cable, fit sockets and lights to second-fix stage.
  • You cannot (without RECI): connect at the main consumer unit, issue the test certificate, sign off the installation.

A typical garden-office electrical install: armoured cable from the house, sub-board with RCBO, ring main for sockets, lighting circuit, optional extras (heater on its own circuit, network point). Budget €600-€1,200 for a sparks to do this end-to-end with a certificate. Your home insurance and any future house sale require the certificate.

Heating options ranked

  • Oil-filled radiator (€60): plug-and-play, but expensive to run for 8 hours/day. Fine for occasional use.
  • Panel heater (€100-€200): similar economics. Cheap to install, expensive to run.
  • Infrared panel heater 0.5kW (€150): surprisingly effective for one person at a desk. Heats objects (you), not air. Lower running cost than convection heaters.
  • Mini-split heat pump (€1,200-€2,500 fitted): the proper answer for daily use. Cools in summer, heats in winter, runs at ~3:1 efficiency. Pays back in 3-5 winters versus electric resistance heating.

Internet

Cheapest: powerline adapters or a fibre extender from the house, €60-€200, works in most cases but degrades through dense walls.

Proper job: run a CAT6 cable in the same trench as the armoured electrics cable. Zero extra labour cost if done at the time of the trench, materials €25 for the cable + €15 for connectors. Gives you wired gigabit and lets you put a separate WiFi access point in the office.

Ventilation

Required, not optional. Two cheap mitigations:

  • Trickle vent in each opening (window + door): €15 each, fitted at order time or DIY in 30 minutes.
  • Passive flue or PIV unit: €40-€150 depending on type.

Skip ventilation and you get mould inside 12 months in a sealed insulated structure. The damp from one occupant's breathing for 8 hours/day adds up faster than people expect.

Realistic timelines

  • DIY weekend turnaround (basic): not possible. Insulation alone is a weekend.
  • DIY 6-8 week turnaround (mid-spec): doable, working evenings and weekends. Sparks visit slots in for 1-2 days during this window.
  • Turnkey contractor build: 4-8 weeks lead time, 2-3 weeks on site. €1,500-€3,000 in labour on top of materials.

The thing nobody tells you

Your garden office becomes part of your house's heat-loss budget. A poorly insulated garden office that you heat 8 hours a day costs €40-€80/month in winter at 2026 electricity prices. A well-insulated one with a heat pump costs €15-€25/month for the same use. Across a 6-month winter, the difference is €150-€330, which is a meaningful chunk of the spec-upgrade cost paying itself back annually.

Insulate properly, install a heat pump, ventilate. The €1,500 you save by going basic-spec costs €300/year in heating, every year, forever.